The Amdjarass (also spelled Amdjeres or Am Djerass) town power system in Chad has evolved from a 1.1 MW Vergnet wind-diesel microgrid into a wind-solar-battery-diesel system. Four 275 kW wind turbines were delivered in 2016. InnoVent says a separate 5.124 MWp, 8,400-module tracker PV plant with 10 MWh of batteries began injecting power on 25 September 2025 alongside four 1 MVA generator sets, for a town load then no greater than 1 MW. The reviewed sources do not publish a measured annual renewable-energy share.
- Research status
- Operating as an expanded hybrid town grid. The original four-turbine, 1.1 MW wind plant is still reported operational. InnoVent reported first PV injection on 25 September 2025, final testing and transformer work in progress, and official completion planned for late November 2025; Le Monde reported in February 2026 that Amdjarass had no routine power cuts and that the solar plant had been inaugurated in October 2025. Vergnet/SOTAFRIC announcements in 2021-2023 described four additional wind turbines, but later 2025-2026 accounts still identify only four turbines, so completion of that wind expansion is not established.
- Historical classification
- Community
- Reported capacity
- 1,100 kW
- Coordinates
- 16.10000, 22.85000