Chavanga's village power station on the remote Tersky Coast is a wind-solar-diesel system commissioned in 2015. A Kola Science Centre technical monograph gives the Chavanga-specific configuration as 50 kW of wind, 32.4 kW of PV, and two 88 kW FG Wilson P110 diesels. The often-repeated 120 kW wind and 75 kW solar figures are totals across the Chavanga, Chapoma, and Tetrino program, not Chavanga alone. Public records show wind-equipment repairs in 2017-2018, diesel replacement work and local line repair through 2025, but no recent measured renewable share.
- Research status
- The Murmansk regional encyclopedia says the wind-solar-diesel station has operated since August 2015. Wind units were sent for repair in October 2017 and returned in November 2018. The Tersky District's 2025 program records diesel-power-plant replacement work in Chavanga as 100% complete by 31 December 2025, after a 2024 low-voltage line repair; it does not disclose replacement genset models or present operating performance.
- Historical classification
- Remote
- Reported capacity
- See component specifications
- Coordinates
- 68.95852, 33.08266