Nusa Penida is PLN's isolated 'Three Nusa' electricity system serving Nusa Penida, Nusa Lembongan and Nusa Ceningan, Bali. Its present renewable core is the Suana hybrid plant: 4.2 MWp DC/3.5 MW AC of solar and a 3 MW battery integrated with diesel generation. Battery energy is reported inconsistently: PLN, the energy ministry and Hitachi's service description give 1.8-1.84 MWh through 2025, while a Hitachi equipment table and a May 2026 PLN Indonesia Power field account say 3 MWh. The plant entered service for the 2022 G20 period, and PLN formally inaugurated an automated Smart Microgrid in November 2025. This is distinct from an older, poorly performing wind-solar-diesel demonstration begun in 2006-09.
- Research status
- The Suana solar-battery-diesel system is operational, and PLN reports the Smart Microgrid operating since November 2025 with automatic real-time dispatch across the three islands. Diesel remains dominant: a May 2026 field account puts installed diesel capacity at about 21 MW against a 16 MW peak load. Through August 2024 the solar plant had generated 3.7 GWh, 6.57% of system generation, at an 18% realized capacity factor. PLN's 2025-34 plan identifies an additional 4.5 MW solar-plus-storage project for 2026-27 and 10 MW wind-plus-storage for 2027-28; these are plans, not commissioned capacity.
- Historical classification
- Community
- Reported capacity
- See component specifications
- Coordinates
- -8.72781, 115.54442