This record is the Town of Woodbridge community microgrid centered on Amity Regional High School, not merely a proposed United Illuminating CHP installation. United Illuminating owns a 2.2 MW FuelCell Energy molten-carbonate fuel-cell plant that normally exports baseload power to the utility grid. Dedicated underground circuits and switchgear allow seven municipal facilities to separate from the wider grid during an outage, with fuel-cell waste heat serving the high school. The fuel cell came online in 2017 and the full microgrid launched in 2018. State and manufacturer records continue to present it as operational; no battery or solar component is documented.
- Research status
- Operational since 2018. Fuel-cell generation began operating in 2017 while the resilience distribution network was still under construction.
- Historical classification
- Building
- Reported capacity
- 2 MW
- Coordinates
- 41.35751, -73.00767