Vava'u now has two distinct solar-microgrid generations that must be separated. The original La'a Lahi plant was commissioned in 2013 at roughly 500-512 kW with SMA diesel-integration controls and small lead-acid support batteries, but Tonga Power's FY2022/23 report says the aging plant suffered a major failure and required comprehensive panel/inverter replacement. A separate Tonga Renewable Energy Project plant—300 kW solar plus a high-power 900 kW/450 kWh grid-forming BESS—was commissioned in March 2023 and received its completion certificate in October 2024. The newer plant is confirmed operating; restoration of the original plant has not been publicly confirmed.
- Research status
- New 300 kW solar + 900 kW/450 kWh BESS plant operational, contract completed/closed in 2024. Original La'a Lahi solar plant reported failed in FY2022/23 with replacement funding under consideration; later restoration not verified.
- Historical classification
- Commercial & demonstration
- Reported capacity
- 1,442 kW
- Coordinates
- -18.68052, -173.98619