This slug originated as SPIDERS Phase I at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii: a 2011-13 Department of Defense/Department of Energy cyber-secure microgrid demonstration integrating about 150 kW of solar, up to 2.4 MW of diesel generation, an uninterruptible-power system and automated controls. It must not be conflated with later projects on the same joint base. SPIDERS demonstrated black start, high instantaneous PV penetration and diesel savings, but a 2018 Navy-microgrid retrospective reported that the system had become idle after operator turnover and an expired password. Separately, the Hawaii Air National Guard's PEARL microgrid completed testing in March 2024 with a 1 MW/600 kWh battery and 1 MW diesel generator, and further expansion was contracted in 2025. Ameresco's 99 MW Puʻuloa microgrid and 6 MW Puʻuloa Solar-plus-storage project are additional development-stage projects, not SPIDERS upgrades or commissioned capacity.
- Research status
- SPIDERS Phase I was a completed demonstration, but its current operability is unverified; the last substantive outcome source found says it was idle in 2018. PEARL is the current demonstrated microgrid at the 154th Wing: HTDC reports successful testing in March 2024 and awarded Burns & McDonnell a US$1.67 million 2025 contract for continued development and added renewables. Puʻuloa remains separate and in development. The 99 MW front-of-meter microgrid received a 2024 DOE GRIP selection, while Hawaii's current project listing describes the 6 MW solar/30 MWh storage project as under Public Utilities Commission review with 2027 commercial operation. Capacities from these phases must not be summed as one Pearl Harbor system.
- Historical classification
- Military
- Reported capacity
- 1,250 kW
- Coordinates
- 21.34451, -157.97489