Sal's island grid has evolved well beyond the legacy solar-wind-diesel snapshot. The two cornerstone projects are the 2.5 MWp fixed-tilt Martifer solar plant commissioned in October 2010 and Cabeólica's 7.65 MW wind farm—nine Vestas V52-850 kW turbines commercially operating since 2012. Cabeólica added a 6 MW/6 MWh BESS at its Sal wind-farm interconnection and inaugurated it on February 11, 2026. A separate 6 MWp Santa Maria solar plant also began operation in 2024. Thermal generation and the exact island-wide annual mix remain incompletely disclosed in current public data, so these capacities should not be converted into an unsupported renewable percentage.
- Research status
- Operational and expanded. Cabeólica's 2024 audited/annual reporting recorded 18,649 MWh from the Sal wind farm, 95.17% availability, and an estimated 23% island penetration. Vestas' maintenance agreement was extended eight years in 2024, although Sal substation repairs were required. The new 6 MW/6 MWh BESS was inaugurated in February 2026 with WinPower as EPC. Current public material expects wind, the new battery and the 2024 solar addition to push Sal above 40% renewable penetration, but no complete 2025/26 island generation table was found to verify that forecast.
- Historical classification
- Island
- Reported capacity
- See component specifications
- Coordinates
- 16.72662, -22.92971