Baega Island is the Baekado energy-self-sufficient-island project on Baekado (Korean: 백아도; also romanized Baega-do, Baegado, or Paega-do) in Baega-ri, Deokjeok-myeon, Ongjin County, Incheon. Commissioned in January 2015, it combined 250 kW of PV, four 10 kW wind turbines, about 1.1-1.125 MWh of lithium-ion storage, an energy-management system, and three existing 75 kW diesel generators. The public promise of a 100% clean/carbon-zero island was not achieved: a National Assembly Budget Office analysis found a 59% renewable/41% diesel energy mix in 2016.
- Research status
- Historically commissioned, but current operation is unverified. Government records show completion in January 2015 and 2016 production of about 270,000 kWh renewable plus 190,000 kWh diesel. The wind component performed especially poorly: a 2019 KIER/Pusan National University study reported measured mean wind speed of 2.32 m/s and capacity factor of only 1.08%, citing a 2017 audit recommendation to relocate the turbines. No public evidence found through 20 July 2026 confirms that relocation occurred or establishes present PV, BESS, wind, EMS, or diesel availability; the record therefore should not be labeled currently 100% renewable or fully operational without qualification.
- Historical classification
- Island
- Reported capacity
- See component specifications
- Coordinates
- 37.08466, 125.95784