Naval Support Facility Indian Head progressed from a 2009–2010 Sandia energy-surety concept to a real 13.2 kV microgrid delivered under MILCON P-222 in 2015. The installed electrical resources are a 4.6 MW natural-gas combustion-turbine CHP plant and two 2.5 MW diesel standby generators, totaling 9.6 MW of on-site generation. A frequently cited '15 MW microgrid' label describes the served system/load class rather than generation nameplate. The Navy replaced the old coal-fired central steam plant with decentralized natural-gas steam plants and the CHP facility; in 2023 it privatized the base distribution system to SMECO while retaining the cogeneration plant.
- Research status
- Operational. The first islanding test occurred in August 2015, and a 2018 commissioning review documented corrective work after more than two years of operation. A 2023 NAVFAC utility-privatization award requires the Navy-owned cogeneration plant to remain able to feed the distribution system, providing the latest direct evidence of continuing microgrid capability, though no recent annual islanding or energy-performance statistics were found.
- Historical classification
- Military
- Reported capacity
- See component specifications
- Coordinates
- 38.59850, -77.17047