The archived 'Río Cauca' entry cannot be validated as an operating microgrid. Its exact 88 kW solar + 500 kW gas/diesel + 500 kW hydro figures reappear in a 2017 Colombian thesis only as 'MR Cali,' sourced back to Microgrid Media, with no owner, coordinates, equipment, commissioning date, or primary project documentation. An actual later EMCALI project named Solar Río Cauca exists at the utility's drinking-water plant, but it is a roughly 998 kWp grid-connected PV installation and is technically and chronologically different. The two should not be merged.
- Research status
- Unverified / identity unresolved. No primary evidence located through July 2026 establishes that the archived 88/500/500 kW microgrid was built or operated. The separate EMCALI Solar Río Cauca project was in execution in 2022 and appears in EMCALI's 2024 management reporting, but that does not validate or update the legacy microgrid. The archived record should remain flagged for manual identity resolution rather than marked operational.
- Historical classification
- Community
- Reported capacity
- See component specifications
- Coordinates
- 3.45157, -76.49528