The legacy Rodrigues record refers most directly to CEB's 1.1 MW Grenade Wind Farm—four 275 kW Vergnet turbines commissioned in 2010—but the current island microgrid is much broader. The isolated 22 kV system now combines Grenade and Trèfles wind, utility and distributed solar, a 1.5 MW/1.5 MWh battery at Pointe Monnier, and predominantly fuel-oil generation at Pointe Monnier and Port Mathurin. CEB's latest complete generation table (July 2023-June 2024) shows only 6.88% renewable generation and 93.12% fuel-oil generation, despite the long-operating wind assets.
- Research status
- Operational isolated island grid. For FY2023/24, CEB reported 50.54 GWh generated, 8.52 MW maximum demand, and 17,014 customers. Grenade produced 1.428 GWh (2.82% of island generation) and Trèfles 0.135 GWh (0.26%). A 1.5 MW/1.5 MWh BESS is already operating at Pointe Monnier for peak shaving and frequency regulation. In August 2025 CEB tendered two additional 1 MW/2 MWh systems (2 MW/4 MWh total) for Rodrigues, with a later public target of end-2026; commissioning was not confirmed by the research date.
- Historical classification
- Community
- Reported capacity
- See component specifications
- Coordinates
- -19.72454, 63.42722