Fort Carson's legacy microgrid record corresponds to Phase 2 of the Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS), a three-feeder, seven-building cybersecure demonstration completed in 2013–2014. It integrated three existing diesel generators, part of a 2 MW photovoltaic plant, and five bidirectional electric-vehicle chargers. The 72-hour test succeeded, but a 2025 Pacific Northwest National Laboratory handbook, based on a December 3, 2024 installation interview, reports that proprietary controls were not sustained, had become obsolete and unsupported by about 2020, and left the system effectively inoperable or 'bricked.' Fort Carson subsequently installed a separate 4.25 MW/8.5 MWh lithium-ion battery in 2018–2019 and completed a separate 1 MW/10 MWh flow battery in November 2024; neither should be presented as proof that SPIDERS remains operational.
- Research status
- Legacy SPIDERS microgrid is abandoned and effectively inoperable. It was handed to the installation without a durable operations-and-maintenance or firmware-support path; limited training and proprietary controls made revival too expensive relative to mission priority. Separate later assets remain: the lithium-ion demand-management BESS was implemented in January 2019, and the GridStar Flow long-duration demonstration finished construction in November 2024 and entered an 18-month test program. No public 2025–2026 operating results were located for the flow pilot.
- Historical classification
- Military
- Reported capacity
- 5,000 kW
- Coordinates
- 38.73749, -104.78886