North America / Island & remote community

Oneida Nation of the Thames

Current status, energy mix, organizations, suppliers, equipment, controls, reported specifications, and project updates—with source-level citations.

CoverageDetailed public record
Named organizations7
System facts18
Sources reviewed9
Evidence reviewed2026-07-20

This record covers the solar-and-storage work of Oneida Nation of the Thames in Ontario, Canada. It is not the Oneida Indian Nation in New York and has no connection to the 250 MW/1,000 MWh Oneida Energy Storage project in Haldimand County. Federal and Ontario governments funded a community-housing solar microgrid in 2016. The clearest project-specific later account is JAZZ Solar's 2021 installation of a 650 kW net-metered solar system with battery storage spanning the Oneida Nation School, Community Centre, Health and Education Centre and Seniors Citizens Home. Oneida subsequently formed Onyota’a:ka Kahsatst^sla’ Ltd., also branded Solar Energy: OK Ltd., to own and operate community solar assets and train an Oneida energy team.

Research status
Oneida's current environment page describes existing solar systems under monitoring, safety and troubleshooting training, supporting continued community operation, while JAZZ documents the 2021 650 kW campus project. JAZZ catalogs a Family Healing Lodge solar job under 2024, but Oneida's owner page says the program is working on its installation; completion and capacity are therefore unverified. Public sources do not disclose the Oneida battery's power, energy, chemistry, manufacturer, commissioning tests or recent performance. A 2023 federal release describes Taykwa Tagamou Nation and Oneida collectively as having built 'Community Solar (1 MW) and Storage (38 kWh) projects'; those ratings cannot safely be assigned to Oneida alone.
Historical classification
Remote
Reported capacity
See component specifications
Coordinates
42.81885, -81.40949
Evidence note: “Every company” cannot be proven from public material alone. This page lists every organization found in the recovered record and reviewed sources, preserves unknown roles, and explicitly marks undisclosed controller or equipment details.

Project delivery

Who was involved in Oneida Nation of the Thames?

7 publicly identified organizations. Where a recovered source named a participant without explaining its work, the role remains explicitly unspecified.

Organization

Government of Canada

Matching infrastructure funder and current capacity-building funder [2][3]

Organization

Government of Canada and Province of Ontario

Each committed C$814,568 toward the originally announced community-housing solar microgrid in 2016. [5]

Organization

Government of Ontario

Matching infrastructure funder [2]

Organization

JAZZ Solar Solutions

Project developer/contractor documenting the 2021 650 kW net-metered solar-and-battery installation and the Family Healing Lodge solar project cataloged under 2024; also supports community energy training. [8][9]

Organization

Natural Resources Canada

Provided 2023 clean-energy training support shared between Oneida and Taykwa Tagamou Nation, including distributed-energy and grid-modernization skills. [9]

Organization

Oneida Nation of the Thames

Community owner, beneficiary and program operator for the solar/microgrid work and associated local energy-team training. [5][6]

Organization

Onyota’a:ka Kahsatst^sla’ Ltd. / Solar Energy: OK Ltd.

Oneida-owned subsidiary formed to own and operate the community solar microgrid and manage community solar work. [7][6]

System evidence

Energy mix, capacity, and specifications

Values can describe different project phases, generation sources, storage systems, or other components. Source citations are attached to each figure so discrepancies remain visible.

Completed community solar
1 MW [3]
Completed storage
38 kWh [3]
2016 infrastructure awards
C$814,568 each from Canada and Ontario [2]
2021 Oneida project solar capacity
650 kW net-metered photovoltaic system integrated across four community facilities and paired with battery storage. [8]
Oneida battery capacity
Battery storage is explicitly included in the 2021 project description, but no Oneida-specific power or energy rating was found. [8]
Ambiguous combined-project rating
A 2023 federal release quotes a contractor saying Taykwa Tagamou Nation and Oneida had built Community Solar (1 MW) and Storage (38 kWh) projects. The grammar combines projects at two Nations, so 1 MW/38 kWh is retained as an unallocated portfolio statement and not reported as Oneida's system rating. [9][8]
Original public funding
C$814,568 federal plus C$814,568 provincial funding announced in 2016 for a new solar electric microgrid serving local community housing; the announcement did not publish capacity. [5]
2024 Family Healing Lodge project
JAZZ catalogs the Family Healing Lodge solar project under 2024, while Oneida's page says its Indigenous Energy Program is working on the rooftop installation. Public sources reviewed do not give its kW rating, completion date or any shared connection to the 2021 battery/control system. [6][8]

Controls and hardware

Equipment and controller details

Manufacturer and model are shown only when a source names them. Generic descriptions are not converted into guessed product assignments.

01

Solar and battery systems

JAZZ Solar Solutions

Federal reporting identifies the delivery partner and aggregate capacities but not module, inverter, battery, or controller models. [3]

02

Photovoltaic system

Model not publicly disclosed

650 kW net-metered array distributed among the Nation School, Community Centre, Health and Education Centre and Seniors Citizens Home. Module, inverter and mounting-system manufacturers were not identified. [8]

03

Battery energy storage

Model not publicly disclosed

Battery storage is part of the 2021 campus project, but chemistry, manufacturer, model, power, energy and usable duration were not publicly established. [8]

04

Monitoring and operations tools

Model not publicly disclosed

Oneida's Energy Team is being trained in system monitoring, performance analysis, safety and troubleshooting. The owner page does not name a commercial EMS, SCADA or monitoring-platform product. [6]

Technical record

Architecture, performance, and project updates

Concise technical facts, milestones, operating results, and later developments. Dated notes distinguish historical design claims from current evidence.

  • General

    Awarded $814,568 from Ontario and $814,568 from the federal government to develop solar-powered microgrid [1]

  • Identity exclusions

    The community is Oneida Nation of the Thames in Ontario. Do not combine this project with Oneida Indian Nation projects in New York or the unrelated Oneida Energy Storage utility-scale battery in Haldimand County, Ontario. [5][6]

  • Project evolution

    Public funding in 2016 described a housing solar microgrid without a rating. By 2020 Oneida had established a dedicated operating subsidiary, and the vendor's 2021 project account describes a 650 kW net-metered solar-plus-battery system across major community facilities. The sources do not explicitly prove whether this is the exact final configuration of the 2016 housing scope or an evolved/additional phase. [5][7][8]

  • Architecture

    The documented 2021 asset is a multi-building, net-metered photovoltaic system paired with battery storage. Public evidence does not establish islanding capability, critical-load transfer, black start, feeder topology or the battery-control strategy, so 'microgrid' should not be expanded into unsupported technical claims. [8]

  • Capacity-building update

    Natural Resources Canada announced more than C$1 million collectively for Taykwa Tagamou Nation and Oneida training, aimed at distributed-energy skills, grid modernization and preparation to consider community energy storage. The funding total is shared and cannot be allocated wholly to Oneida. [9]

  • Current evidence gap

    No current generation history, renewable share, avoided fuel/emissions, storage dispatch data, outage performance, interconnection agreement, battery health or independent commissioning record was found through July 2026. [6][8]

Provenance

9 sources

Primary owner, government, university, supplier, and engineering sources are preferred. Archived references preserve claims whose original pages moved or disappeared.

  1. [1]
    Recovered Microgrid Projects record

    Internet Archive · Archived source · captured 2020-07-06

  2. [2]
  3. [3]
  4. [4]
    Environment at Oneida — solar energy projects

    Oneida Nation of the Thames · Primary source

  5. [5]
  6. [6]
    Environment at Oneida

    Oneida Nation of the Thames · Primary source

  7. [7]
    Oneida Nation of the Thames Audited Consolidated Financial Statements, March 31, 2020

    Oneida Nation of the Thames / Indigenous Services Canada · Primary source

  8. [8]
    JAZZ Solar Solutions - Projects

    JAZZ Solar Solutions · Primary source

  9. [9]