North America / Defense

Twentynine Palms Microgrid | California | Marine | GE

Organizations, planners, suppliers, equipment, controls, and reported system specifications—with source-level citations.

CoverageDetailed public record
Named organizations1
System facts10
Sources reviewed1
Last researched2026-07-19

Twentynine Palms Microgrid | California | Marine | GE is catalogued as a defense system in North America.

Research status
Operational
Historical classification
CHP
Reported capacity
13 MW
Coordinates
34.23330, -116.05543
Evidence note: “Every company” cannot be proven from public material alone. This page lists every organization found in the recovered record and reviewed sources, preserves unknown roles, and explicitly marks undisclosed controller or equipment details.

Project delivery

Who was involved in Twentynine Palms Microgrid | California | Marine | GE?

1 publicly identified organizations. Where a recovered source named a participant without explaining its work, the role remains explicitly unspecified.

Organization

GE

Publicly named participant; role not specified in the recovered record [1]

System evidence

Reported capacity and specifications

Values can describe different project phases or components. Source citations are attached to each figure so discrepancies remain visible.

KW Solar
6000 [1]
KW Gas/Diesel
16400 [1]
Storage
576 kWh [1]

Controls and hardware

Equipment and controller details

Manufacturer and model are shown only when a source names them. Generic descriptions are not converted into guessed product assignments.

No controller or equipment model was found in the reviewed public sources. This is a disclosure gap, not evidence that the project lacks coordinated controls.

Recovered detail

Additional technical notes

Concise system facts recovered from the historical project record. Treat these as historical unless a newer primary source confirms them.

  • Management

    • GE U90+ Microgrid Controller [1]

  • Management

    GE Proficy HMI/SCADA CIMPLICITY [1]

  • Storage

    Advanced energy storage system [1]

  • Generation

    Solar PV [1]

  • Generation

    2 CHP Facilities: [1]

  • Generation

    A 7.2 MW unit (installed 2003); system has “black start capability” [1]

  • Generation

    A 9.2 MW system (installed 2013) [1]

Provenance

1 source

Primary owner, government, university, supplier, and engineering sources are preferred. Archived references preserve claims whose original pages moved or disappeared.

  1. [1]
    Recovered Microgrid Projects record

    Internet Archive · Archived source · captured 2021-01-20