Baron Techno Park is an Indonesian government renewable-energy research and training site. Published plant studies document a PV-wind-biodiesel-diesel-battery hybrid system and a 25 kVA hybrid controller, but do not identify the controller manufacturer.

Research status
Government research and demonstration site; present operating configuration not independently confirmed
Historical classification
University
Reported capacity
See component specifications
Coordinates
-8.13243, 110.54369
Evidence note: “Every company” cannot be proven from public material alone. This page lists every organization found in the recovered record and reviewed sources, preserves unknown roles, and explicitly marks undisclosed controller or equipment details.

Project delivery

Who was involved in Baron Techno Park?

3 publicly identified organizations. Where a recovered source named a participant without explaining its work, the role remains explicitly unspecified.

Organization

Agency for the Assessment and Application of Technology (BPPT; now BRIN)

Developer and research-site operator [2][3]

Organization

Government of Norway

NORAD grant funder reported for the 2009 hybrid-system development [2]

Organization

Government of the Special Region of Yogyakarta

Regional project collaborator [2]

System evidence

Reported capacity and specifications

Values can describe different project phases or components. Source citations are attached to each figure so discrepancies remain visible.

KW Solar
40 [1]
KW Gas/Diesel
100 [1]
Published installed PV
36 kW [2]
Published wind generation
10 kW plus 5 kW turbines [2]
Published firm generation
25 kW biodiesel generator plus 25 kW backup diesel generator [2]
Published battery bank
288 kVAh, 1,200 Ah; 120 cells [2]

Controls and hardware

Equipment and controller details

Manufacturer and model are shown only when a source names them. Generic descriptions are not converted into guessed product assignments.

01

Hybrid power controller

Model not publicly disclosed

Published rating is 25 kVA; manufacturer and model were not disclosed in the reviewed sources. [2]

Provenance

3 sources

Primary owner, government, university, supplier, and engineering sources are preferred. Archived references preserve claims whose original pages moved or disappeared.

  1. [1]
    Recovered Microgrid Projects record

    Internet Archive · Archived source · captured 2020-07-06

  2. [2]
    Effect of Load Growth on PLTH Baron Techno Park Performance

    Indonesian Ministry of Education Garuda repository · Primary source

  3. [3]
    Renewable Energy: Policy and Strategy — Baron Technopark demonstrations