Huatacondo Microgrid

Community · Operational
Chile’s first microgrid project

Organizations Involved

Additional Details

The energy management system provides online set-points for generation units while minimizing operating costs, taking into account renewable resource forecast, load, solar tracking, and water consumption.

HUATACONDO’S MICROGRID / STORAGE SYSTEM
• 96 lead-acid batteries
• Charge and discharge
• Droop curves P-f, Q-V
• MODBUS RTU
• IGBT VSC
• 40 kVA
• Dynamic SOC modeling

Screenshot 2015-12-12 at 1.27.00 PM Screenshot 2015-12-12 at 1.26.49 PM

Wind

• 3kW
• 12m high
• 8 m/s average
• Bird of prey protection
• 1ph – 3ph inverter
• MPPT

HUATACONDO’S MICROGRID / PV POWER PLANT
• 22.68kW
• 84 PV panels
• 168m^2
• 18º azimut angle
• 1 axis tracking system
• 3 monophase inverters
• 1200 Wp/m^2
• MPPT

Screenshot 2015-12-12 at 1.28.56 PM Screenshot 2015-12-12 at 1.28.43 PM

2 linear actuators
• No sensors
• Centralized control
• Position feedback
• Intelligent relay local control
• Mechanical constraints
considered on EMS

http://idbdocs.iadb.org/wsdocs/getdocument.aspx?docnum=36861477

Location

Huatacondo, Pozo Almonte, Chile