Battery system: 3.2MWh
PCS: 1.25MW (1MW : Frequency & Voltage control , 250kW: Back-up Power)
Wind Power: 400kW
Solar: 320kW
Commissioning: 2014.10
Application: Renewable Enhancement, Reduce Diesel Generator
Residence: 286 people , 168 house
Diesel Power Capacity : 300kW
Average Load: 95kW Peak Load: 173kW
EMS: Automatic control
100 % Renewable Island
Budget: $10M
Frequency maintain ratio(0.2sec sampling)
Previous(Diesel power plant) : 57% – Today (MicroGrid) : 100%
Optimal combination of DG and evaluation of economic feasibility System analysis and optimal location of DG Generation control, emergency control, load control, etc. Operation manual, emergency operation manual Verify technology based on DG capacity combination Build infrastructure for commercialization through site optimization [Before MG technology] Demonstration Develop EMS and operating technology Develop engineering process Wind Fresh ESS water House House PV
Organizations Involved
Location
Gasadogunghang-gil, Jindo-gun, Jeollanam-do, South Korea